Operation; Use Of The Control Panel; Modifying The User Parameters; Modifying The Installer Parameters - Baxi POWER HT+ Series Installation And Service Manual

Gas fired floor-standing condensing boiler
Hide thumbs Also See for POWER HT+ Series:
Table of Contents

Advertisement

8 Operation

8
Operation
8 8 .1

Use of the control panel

Fig.70
18. February 2014
Tuesday
1.5 bar
MENU
Fig.71
18. February 2014
Tuesday
1.5 bar
MENU
Fig.72
----------------------------------------------------
Information
Information
Set time and date
6"
68
14:13
MENU
MW-3000052-EN-02
14:13
MENU
MW-3000052-EN-02
MENU
MENU
MW-3000082-EN-02

8.1.1 Modifying the user parameters

1. Press the
key to access the parameters.
MENU
Note
Press the
key to return to the main display.
MENU
The user parameters can now be accessed. Use the
lect and modify them.
See
List of user parameters, page 72.

8.1.2 Modifying the installer parameters

1. Press the
key to access the parameters.
MENU
2. Hold down the
and
onds.
keys simultaneously for at least 6 sec­
MENU
7609474 - v02 - 04092014
button to se­

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents