12 SERVICE WORK ON THE CHASSIS
12.10
60
Installing the lower triple clamp
A00466-10
F02400-10
F02401-10
A00468-12
Main work
–
Clean the bearing and sealing elements, check for damage,
and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount
upper steering head bearing.
–
Check whether upper steering head seal
tioned.
–
2
Slide on protective ring
–
Position the upper triple clamp.
–
4
Mount screw
, but do not tighten yet.
–
Position the fork legs.
5
Bleeder screws
are positioned toward the front.
Info
Grooves are milled into the side of the upper end of the
fork legs. The second milled groove (from the top) must
be flush with the upper edge of the upper triple clamp.
–
6
Tighten screws
.
Guideline
Screw, bottom triple
clamp
p. 166)
1
is correctly posi-
3
and O-ring
.
M8
17 Nm (12.5 lbf ft)