–
Position the cable guide.
–
Mount and tighten screws
Guideline
Screw, brake line
holder on bottom
triple clamp
–
Secure the brake line with cable tie
F02430-10
–
Tighten screw
Guideline
Screw, top steering
head
–
Mount and tighten screw
Guideline
Screw, top
steering stem
F02431-10
–
Tighten screws
Guideline
Screw, top triple
clamp
F02432-10
–
Position steering damper and mount and tighten screws
Guideline
Screw, steering
damper
–
Remove the cable ties and position the handlebar.
–
Position the handlebar clamps with the rubber washers and
elastomers.
–
Mount screws
F02433-10
Guideline
Screw, handlebar
clamp
Info
Make sure the installed gaps are even.
Finishing work
–
Check that the wiring harness, throttle cables, and brake and
clutch lines can move freely and are routed correctly.
–
Install front fender. (
–
Install the front wheel.
–
Check steering head bearing play. (
–
Remove motorcycle from the lift stand. (
SERVICE WORK ON THE CHASSIS 12
7
.
M5
2 Nm (1.5 lbf ft)
8
.
4
.
M20x1
12 Nm (8.9 lbf ft)
9
.
M8
20 Nm (14.8 lbf ft)
bk
.
M8
15 Nm (11.1 lbf ft)
M6
15 Nm (11.1 lbf ft)
bm
and tighten evenly.
M8
20 Nm (14.8 lbf ft)
p. 66)
(
p. 101)
p. 62)
Loctite
®
243™
bl
.
p. 55)
61