JLG 600S Operation And Safety Manual page 159

Table of Contents

Advertisement

2.
Tighten nuts in the following sequence:
3.
The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.
31215033
SECTION 7 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
4.
Wheel nuts should be torqued after first 50 hours of opera-
tion and after each wheel removal. Check torque every 3
months or 150 hours of operation.
Table 7-18. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
40 ft. lbs.
95 ft. lbs.
(55 Nm)
(130 Nm)
3rd Stage
170 ft. lbs.
(230 Nm)
7-31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

660sj

Table of Contents