Preparation And Inspection; Operation; Pipe Rack - JLG 600S Operation And Safety Manual

Table of Contents

Advertisement

SECTION 6 - ACCESSORIES
• Do not weld to platform.
• Do not ground through the platform.
• Do not use a high frequency arc starter with TIG welder.

Preparation and Inspection

Connect ground clamp to metal being welded, make sure there is
a good ground connection and observe proper polarity, begin
welding.

Operation

Start engine turn on generator then turn on welder.
Wear proper welding apparel. Set welder to proper amperage
and voltage settings for thickness and type of metal being
welded. Begin welding.
Refer to Miller Welder Operators Manual.
Generator will not start under an electrical load.
6-8
6.8

PIPE RACK

Pipe Racks provide a means of storage of pipe or conduit inside
the platform to help prevent rail damage and optimize platform
utility. Pipe Racks reduce clutter and optimize available platform
capacity.
REDUCE PLATFORM CAPACITY BY 100 LBS. (45.5 KG).
MAXIMUM LOAD IN THE RACKS IS 180 LBS. (82 KG), EVENLY DISTRIBUTED BETWEEN
THE TWO RACKS.
WEIGHT IN RACKS PLUS WEIGHT IN PLATFORM MUST NOT EXCEED RATED CAPACITY.
31215033

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

660sj

Table of Contents