Figure 35: Processor sensor cable connections steps 7 & 8
9. Repeat this procedure for the B Side sensor cable.
10. Pull the sensor cables back out through the cable glands until they are the
correct length to plug into T9 (A Side to terminals 1, 2, 3; B Side to terminals
4, 5, 6). Tighten the cable glands.
Figure 36: Processor sensor cable connections step 10
Sensor cable splices
See "Cable preparation (all connections)" on page 31 for steps 1 to 6.
7. For splice connections bend and form the section of twisted braided shield on
the left side of the cable into a conductor that is parallel with, and separated
from, the center conductor by 5 mm. Trim the second section of twisted
braided shield flush with the black jacket.
8. Trim the twisted braided shield and center conductor to a length of 6 mm past
the clear tube.
Figure 37: Sensor cable splices steps 7 & 8
9. Repeat this procedure for the second sensor cable.
FlexZone™ Product Guide
T9
B Side
B-Side
A-Side
A Side
Chapter 2: Installation
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flexzone-4Flexzone-60

Table of Contents