Install Cables Between Media Gateway And Mdf - Avaya S8700 Installing Manual

Media gateway
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Installing the Avaya™ S8700 Media Server with Avaya™ MCC1 or SCC1 Media Gateway
Cable Routing to Bottom Terminal Blocks
Figure notes
Main Distribution Frame
1
2
AC Power Cord (AC-powered media
gateways only)
3
Cable Slack Manager Number 1
Trunk/Auxiliary Field
4
5
Station Distribution Field

Install Cables Between Media Gateway and MDF

1
Install D rings on the wall between the cable slack manager and the terminal/connecting
blocks mounted on the MDF.
2
Install a self-adhesive port label on the back of each connector on the connector cable.
Position the labels so the media gateway connector retainers do not cover them.
At the rear of the media gateway, connect one end of the connector cable to the assigned
3
connector.
Route the cable down the rear of the media gateway, through the cable slack manager,
4
and to the MDF.
At the MDF, connect the other end of the cable to the assigned terminal/ connecting
5
block connector.
Store the cable slack in the cable slack manager.
6
7
Repeat Steps 2 through 6 until all cables are installed.
Connect the Media Gateway to the MDF
Cable Slack Manager Number 2
6
7
Cable Slack Manager Number 3
Media Gateway(s)
8
9
Building Cables (through cable
trough)
10
10 AWG (#25) (6 mm
Coupled Bonding Conductor
May 2003
r758432b MMR 052996
2
) Wire to
121