1. Mount all removed parts and covers on the circuit breaker again.
Proceed as shown in the Section Removing the front plate and accessories (Page 172) in
the reverse order.
2. Reconnect the terminals for auxiliary supply connection (if required).
3. Withdrawable breaker only: Move the circuit breaker into the TEST position.
4. Perform the following operations ten times using the relevant accessories (including via
remote access, if available):
– Open
– Close
– Trip with the test button on the ETU
Perform the operations in the following order:
– Open - spring discharged
– Open - spring charged
– Close - spring discharged
– Close - spring charged
5. Check whether the following modules respond correctly (if available):
– Accessories
– Spring charging motor MO
– Undervoltage release UVR
– Auxiliary solenoids (closing coil (CC) / shunt release (ST))
– Auxiliary switches and signaling switches
– Locking and interlocking devices
176
Note
For withdrawable breaker only: Interlocking devices cannot be tested in the breaker
positions DISCONNECT and TEST.
Air circuit breaker 3WL10
Manual, 11/2017, L1V30499596002-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentron 3wl1010-2cf41-1lw1

Table of Contents