Connection and commissioning
5.2 Mounting and connection
Installing the guide frame
1. Install the guide frame in the switchboard panel:
Floor mounting (For the drilling template, see Chapter Switchboard panel, hole and
drilling templates, withdrawable breaker (Page 193)):
– Fasten the guide frame to the base of the switchboard panel with four screws M8 x 25
138
with a tightening torque of 21 Nm.