Download Print this page

Installing The Power-Supply Module In The Switch - Cisco IE 3010 Hardware Installation Manual

Advertisement

Power Supply Installation
Power-Supply Module Installation
Figure 39
Crimping the Terminal Lug
4.
Slide the ground screw from Step 1 through the terminal lug. Insert the ground screws into the opening on the cable
side.
Figure 40
Attaching the Terminal Lug
C is co IE
1
Dual-hole terminal lug
5.
Use a ratcheting torque screwdriver to tighten the ground screws to 30 in-lb (± 2 in-lb).
6.
Attach the other end of the ground wire to a grounded bare metal surface, such as a ground bus or a grounded bare
rack.

Installing the Power-Supply Module in the Switch

1.
Ensure that the power is off at the AC or DC circuits.
Locate the circuit breakers, turn them OFF, and tape them in the OFF position.
Warning:
If the power is not off at the AC or DC circuit breaker, do not touch the power-input terminal.
2.
Use a Phillips screwdriver to loosen the two captive screws of the blank power-supply module and gently pull it out.
See
Figure 41 on page 52
30 10
and
Figure 42 on page
52.
51

Advertisement

loading