Installing An Xfp - Avaya Ethernet Switch 5000 Series Manual

Installing transceivers and optical components
Hide thumbs Also See for Ethernet Switch 5000 Series:
Table of Contents

Advertisement

Installing an XFP

Install an XFP to provide a 10 gigabit Ethernet interface between the switch and other network
devices.
Installing an XFP takes approximately three minutes.
Prerequisites
• Verify that the XFP is the correct model for your network configuration.
• Before you install the optical connector, ensure it is clean.
Warning:
Risk of eye injury by laser
Fiber optic equipment can emit laser or infrared light that can injure your eyes. Never look
into an optical fiber or connector port. Always assume that fiber optic cables are connected
to a light source.
Electrostatic alert:
Risk of equipment damage
To prevent damage from electrostatic discharge, always wear an antistatic wrist strap
connected to an ESD jack.
Caution:
Risk of equipment damage
Only trained personnel can install this product.
Procedure steps
Caution:
Risk of equipment damage
XFPs are keyed to prevent incorrect insertion. If the XFP resists pressure, do not force it;
turn it over, and reinsert it.
1. Remove the XFP from its protective packaging.
2. Grasp the XFP between your thumb and forefinger.
3. Insert the XFP into the XFP slot on the module.
Installing Transceivers and Optical Components on Avaya Ethernet Switch 5000 Series
Apply a light pressure to the XFP until the device clicks and locks into position in
the module.
Installing an XFP
December 2013
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ers 5632fd

Table of Contents