Maintenance; Maintenance Schedule - Presto Conti Compact Series Operating And Maintenance Instructions Manual

Channel-type baling press
Table of Contents

Advertisement

PRESTO
GmbH & Co. KG
Bad Laer
Be sure to check the guide grooves of the
telescopic plates once a month for blockage
or
material accumulation and eliminate if
necessary.
7.3.

Maintenance

7.3.1. Maintenance schedule

On the following pages you will find a list of
the maintenance works with information
with respect to the maintenance interval and
reference to the description of the work.
The maintenance of electrical equipment
may be carried out by experts or instructed
persons only.
Meaning of the abbreviations:
A = works, that can be carried out by
the operator of the machine
F = works that have to be carried out
by an expert (e.g. PRESTO service
mechanic)
Abbreviation for the intervals:
T
daily
W
weekly
M
monthly
H
every six months
J
annually
04/2012
7 - 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents