For detailed description of adjustment
possibilities of the touch panel see page
6-11.
6.3.
Works prior to initial commissioning
You will find information with regard to
transport and loading in section 6.6
"Transport and loading".
First check the unit for completeness of
supplied parts. Use the enclosed shipping
documents for this purpose.
Project documentation and wiring diagrams
of the manufacturer are enclosed to the unit.
The unit has to be installed and connected
according to these plans.
Place unit on a plain base. The base must be
capable of bearing the unit permanently. It
must be possible to screw the legs of the unit
with the base. In order to fix the unit you
should use heavy-duty dowels and
corresponding screws (see enclosed project
documentation).
Leave sufficient space around the machine as
shunting area for industrial trucks.
Screw the sheet, i.e. the "bale slide" (50)
contained in the scope of supply with the
bottom side of the channel
(see fig. page 6-3).
04/2012
6 - 2
The unit may be erected by
qualified staff with the
corresponding specialized
knowledge only (Explanation
see chapter 7, page 1).