General Operation; Overview Of Operation; Description Of Operation; Warming-Up - Toshiba e-STUDIO555 Service Manual

Multifunctional digital systems
Hide thumbs Also See for e-STUDIO555:
Table of Contents

Advertisement

4.

GENERAL OPERATION

4.1

Overview of Operation

Copier operation
4.2

Description of Operation

4.2.1

Warming-up

1. Initialization
Turning the power ON
→ The IH coil is turned ON.
→ The set number "1" reproduction ratio "100%" and "WAIT WARMING UP" appears.
→ The fan motors are turned ON.
→ Initialization of the scanning system
-
The carriage moves to the home position and stops.
-
The carriage moves to the peak detection position.
-
The exposure lamp (EXP) is turned ON.
-
Peak detection (a white color is detected by the shading correction plate)
-
The exposure lamp (EXP) is turned OFF.
-
The carriage moves to the home position.
→ Initialization of the feeding system
-
Each drawer tray goes up
→ Initialization of the writing system
-
The polygonal motor (M2) rotates at a high speed. (e-STUDIO755/855)
-
The polygonal motor (M2) rotates at a low speed. (e-STUDIO555/655)
-
The beam position is controlled. (e-STUDIO755/855)
→ Other
-
The main charger cleaner operates.
2. Pre-running operation
The pre-running operation starts when the temperature of the fuser roller surface reaches a certain
degree. (Pre-running is not performed when the fuser roller is already hot enough.)
→ The fuser motor (M3) is turned ON.
-
The fuser roller rotates.
→ The drum motor (M11) is turned ON.
-
The drum rotates.
→ The used toner transport motor (M9) is turned ON
-
The used toner transport auger rotates.
→ Image quality control
-
It charges the drum and detects the drum surface potential to set the optimal condition for
outputting the image.
-
It forms a patch on the drum and reads out its reflective ratio to set the optimal condition.
3. When the surface temperature of the fuser roller becomes sufficient for fusing;
→ The IH coil (IH-COIL) is turned OFF.
→ The set number "1" and "READY" are displayed.
© 2009 - 2011 TOSHIBA TEC CORPORATION All rights reserved
Operation during warming-up, pre-running and standby
Automatic feed copying by pressing [START] button
Copying operation
Bypass copying
Interrupt copying
4 - 1
e-STUDIO555/655/755/855
GENERAL OPERATION
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents