10.3.12 Resetting the Parallel Capacity/Redundant System after
EMERGENCY UPM OFF
Do not attempt to restart the UPM after Load Off until the cause of
The Emergency UPM Off PUSH IN TO RESET pushbutton is a small white button
on the SBM Control/Monitor Panel. The PUSH TO RESET pushbutton pops out
when the Emergency UPM Off pushbutton on the SBM Control/Monitor Panel is
activated.
To reset the Parallel Capacity/Redundant system:
1.
Press the Emergency UPM Off PUSH IN TO RESET pushbutton until it clicks
in and remains recessed.
2.
The Parallel Capacity/Redundant system is now reset. To restart the Parallel
Capacity/Redundant system, follow the procedure at the beginning of this
chapter.
10−14
CAUTION
the emergency has been identified and cleared.
EATON Powerware 9315 Parallel Capacity/Redundant System
164201150
Rev. E www.powerware.com
1