Preliminary Installation Information

Refer to the following while installing the Parallel Capacity/Redundant system:
Appendix A of this manual for installation drawings and additional installation
notes.
Dimensions in this manual are in millimeters and inches.
Do not tilt the System Bypass Module (SBM), System Maintenance Bypass
(SMB), UPMs or other cabinets more than
The conduit landing plates are to be removed to add conduit landing holes as
required. Plate material is 16 gauge steel (0.06 in. thick).
The Remote Emergency Power Off (EPO) and the EMERGENCY UPM OFF
pushbuttons open all breakers in the SBM, shut down the UPMs, and isolate
power from your critical load. Local electrical codes may also require tripping
protective devices upstream from the UPMs.
The SBM cabinet must be installed on a level, sealed concrete pad or floor.
If perforated floor tiles are required for ventilation, place them in front of the
UPMs. Refer to Table H in Appendix A for equipment weight and point loading.
Details about control wiring are provided in each procedure for connecting
options and features. Drawings 164201150−13 and 164201150−14 in
Appendix A identify the control wiring terminations.
EATON Powerware 9315 Parallel Capacity/Redundant System
164201150
Rev. E www.powerware.com
WARNING
Installation should be performed by qualified personnel.
10° during installation.

2
2−1

Advertisement

Table of Contents
loading

Table of Contents