Starting the SCE 2000 Platform

Checking Conditions Prior to System Startup

Check the following conditions before you start your SCE 2000 platform:

Performing Complex Configurations

After you have installed your SCE 2000 platform hardware, checked all external connections, turned on
the system power, allowed the system to boot up, and performed the initial system configuration, you
might need to perform more complex configurations, which are beyond the scope of this publication.
For further information on system and interface configuration, refer to the following documents:

Starting the System and Observing Initial Conditions

After installing your SCE 2000 platform and connecting cables, complete the following steps to start the
SCE 2000 platform:
Step 1
Make sure the power cables are connected to the SSCE 2000 platform.
Step 2
Plug the AC power supply cables into the AC power source, or make sure the circuit breakers at the DC
panels are turned to the on position. Turn both power switches on.
Step 3
Listen for the fans; you should immediately hear them operating.
Step 4
During the boot process, observe the following LEDs:
Note
It takes a several minutes for the SCE 2000 platform to boot and for the status LED to change from
orange to flashing orange or flashing green.
Cisco SCE 2000 4xGBE Installation and Configuration Guide
7-2
Both power supply units are installed and connected
First-time startup at installation:
SCE 2000 platform connected to local console (CON port)
The console terminal is turned on and properly configured
Subsequent startups
Line and Cascade interfaces are properly cabled (optional)
SCE 2000 platform is connected to at least one of the following types of management stations:
Direct connection to local console (CON port)
Remote management station via the LAN (Mng port)
Cisco SCE2000 and SCE1000 Software Configuration Guide
Cisco SCE2000 and SCE1000 CLI Command Reference
Both Power LEDs should be green.
Bypass LED should be green while the SCE 2000 platform is on bypass and unlit when the bypass
is turned off.
The Status LED should be a constant orange while booting. After a successful boot, the Status LED
is flashing green.