Chrysler 2000 LHS Owner's Manual page 1388

Table of Contents

Advertisement

LH
SERVICE PROCEDURES (Continued)
Fig. 13 Install Screws
1 – PATCH
2 – GAP
Fig. 14 Grind Surface
1 – PATCH
2 – GAP
3 – DISC GRINDER
REMOVAL AND INSTALLATION
UPPER RADIATOR CLOSURE PANEL
REMOVAL
(1) Open hood.
(2) Mark bolt locations on the upper radiator clo-
sure panel.
(3) Remove bolts attaching windshield washer bot-
tle and speed control servo, if equipped (Fig. 17).
(4) Remove headlamp jackscrews both sides.
(5) Remove fasteners attaching upper bumper fas-
cia.
(6) Remove bolts attaching the forward edge of
upper radiator closure panel.
Fig. 15 Cover Gaps With Mesh
1 – GROUND DOWN AREA
2 – PATCH
3 – MESH
Fig. 16 Cover Mesh With Epoxy
1 – EPOXY
2 – MESH
3 – PATCH
4 – SPREADER
(7) Remove bolts attaching upper radiator closure
panel.
(8) Disconnect hood latch cable from hood latch.
(9) Remove upper radiator closure panel from vehi-
cle.
(10) For replacement of upper radiator closure
panel, remove hood latch, and any other hardware.
INSTALLATION
(1) Place in position the upper radiator closure
panel.
(2) Connect hood latch cable to hood latch.
(3) Install bolts attaching upper radiator closure
panel. Check bolt alignment marks.
BODY
23 - 37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

300mConcordeIntrepid

Table of Contents