CVX 1800 Hardware Installation Guide
Installing the CVX 1800 Chassis
Telco and EIA Rack Hole Spacing
You can use mounting flanges to install the CVX 1800 chassis in a Telco or EIA
rack. Telco and EIA racks have 0.5-inch spacing between the dual mounting
holes, and 0.625-inch spacing between the dual mounting hole pairs. The
following figure shows the positions on the mounting flange that you use for
Telco and EIA racks.
1-20
Note: Before you install the CVX 1800 chassis in a rack, determine the
type of rack you have so that you can properly align the mounting holes.
1
Use positions
1, 4, 7, and 10
for EIA racks.
4
7
10
2
3
Use positions
2, 3, 5, 6, 8, and 9
for Telco racks.
5
6
8
9
296-1011-200 Rel. 5.0, Doc. Rev. 08.01
CVX-0067B