CVX 1800 Hardware Installation Guide
Mounting the CVX 1800 in a Rack

Ceiling Requirements

Consider the following ceiling requirements before you install the rack:
The ceiling should be clear of obstructions such as beams, heating and air
conditioning ducts, water pipes, and lights.
The ceiling should not have sprinklers; however, appropriate fire protection
devices should be available.

Size and Weight Considerations

Before you install the rack at your site, make sure that the equipment room can
accomodate the size and weight of the rack and the CVX 1800.
To determine the total weight, add the weight of all of the CVX 1800 chassis
(about 100 lb, 45.36 kg each), and the weight of the rack.

Reference

For information about general equipment requirements, see the Telcordia Network
Equipment Building System (NEBS) Requirements: Physical Protection (GR-63).

Nortel Networks PTE 2000 Rack

Nortel Networks offers two types of PTE 2000 racks:
PTE 2000 NEBS-compliant rack (NTRU0134)
PTE 2000 ETSI-compliant rack (NTRU0234)
Reference
For PTE 2000 rack installation instructions, see the PTE 2000 Installation Guide
(IM 07-08-1543).