Installing The Switch In An Equipment Rack - Nortel BayStack 380 Installing

10/100/1000 switch
Hide thumbs Also See for BayStack 380:
Table of Contents

Advertisement

6

Installing the switch in an equipment rack

Required tool: Phillips screwdriver for attaching brackets to the switch
Rack requirements:
A space of 2.8 inches is provided for each switch in an EIA or IEC standard 19-inch
(48.2-centimeter) equipment rack.
The rack is bolted to the floor and braced if necessary.
The rack is grounded to the same grounding electrode used by the power service in the area.
The ground path must be permanent and must not exceed 1 ohm of resistance from the rack to
the grounding electrode.
1
Attach a bracket to each side of the switch.
The bracket with the round holes goes on
the right side of the switch, where the
round fan vents are located.
212860-A
10525FA
2
Slide the switch into the rack. Insert and
tighten the rack-mount screws.
10526FA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Baystack 380-24t

Table of Contents