6
Installing the switch in an equipment rack
Required tool: Phillips screwdriver for attaching brackets to the switch
Rack requirements:
•
A space of 2.8 inches is provided for each switch in an EIA or IEC standard 19-inch
(48.2-centimeter) equipment rack.
•
The rack is bolted to the floor and braced if necessary.
•
The rack is grounded to the same grounding electrode used by the power service in the area.
The ground path must be permanent and must not exceed 1 ohm of resistance from the rack to
the grounding electrode.
1
Attach a bracket to each side of the switch.
The bracket with the round holes goes on
the right side of the switch, where the
round fan vents are located.
212860-A
10525FA
2
Slide the switch into the rack. Insert and
tighten the rack-mount screws.
10526FA