Basic operating procedure

2-4

Basic operating procedure

2-4-1
Overview
8
The following diagram provides an overview of the installation procedures. For
experienced installation engineers, this may provide sufficient information. For
others, cross-references are made to various sections in this manual where
more explicit information is given.
/i
Mount the CJ1W-PNT21 PROFINET IO Controller Unit.
Power up the CJ1W-PNT21 and perform initial setup.
Configure the PROFINET IO Controller Unit.
PROFINET IO starts communicating, confirmed by the LEDs
turning on. Check status of other LED Indicators.
Setup the PROFINET IO network.
Section 2-4