Before You Start; Installation Requirements; Certification; Carton Contents / Item Checklist - Rinnai 650 Operation & Installation Manual

Hide thumbs Also See for 650:
Table of Contents

Advertisement

INSTALLATION REQUIREMENTS

This heater must be installed by an authorised person. The installation must conform to local regulations.
The installation must also comply with the instructions supplied by Rinnai.
Service and removal must be carried out by an authorised person.

CERTIFICATION

The Rinnai 650 and 750 Gas Fires have been certified by the Australian Gas Association.
The AGA Certification Number is shown on the appliance dataplate.
No parts or functions should be modified or permanently removed from the heater.
Please keep these instructions in a safe place for future reference.

CARTON CONTENTS / ITEM CHECKLIST

The components for Rinnai 650 and 750 Gas Fires are supplied in separate cartons, the following tables list which
components are in each carton. Ensure that the components listed for the installation method being installed are
present before proceeding with the installation.
The Engine, Fascia and Burn Media are packed into three separate cartons and are required for all
installation types.
IMPORTANT
2
2
2
5
8
Major component descriptions and carton contents
Rinnai 650 or 750 Engine (RVD600ER or RVD700ER).
1
Fascia attachment screws (3 x 8g black, pre-fitted within the heater engine).
2
Four Satchels - granule pack (x2), crushed glass (x1) and rockwool (x1).
3
Operation and Installation manual.
4
Semi rigid stainless steel gas pipe with 5/8" connections (x1).
5
½" BSP - 5/8" UNF flared brass adaptors (x1).
6
½" BSP Flared nut (x1).
7
5/8" UNF Plug (x1).
8
Remote Control, Infra Red (IR).
9
Three sided fascia.*
10
Three sided fascia infill (used to create a infill for masonry installations).
11
Four sided fascia (used for elevated installations).*
12
Three sided masonry fascia (alternative to infill, available for RVD700ER models Only).
13
*False fire place (Zero clearance) applications will require the use of a Zero clearance frame.
Ceramic log set OR Ceramic stone set, there is a different set of each for each model.
14
Rinnai

BEFORE YOU START

10
3
4
7
6
9
12
11
Engine
4
13
14
5
OR
14
5
Fascia
Burn
Options
Media
RDV 600_700 OIM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

750Rdv600erRdv700er600

Table of Contents