Rinnai Arriva 750 Installation Manual

Rhfe750etrn; rhfe750etrl
Hide thumbs Also See for Arriva 750:

Advertisement

Installation guide

Arriva 750
Models: RHFE750ETRN/RHFE750ETRL

Advertisement

Table of Contents
loading

Summary of Contents for Rinnai Arriva 750

  • Page 1: Installation Guide

    Installation guide Arriva 750 Models: RHFE750ETRN/RHFE750ETRL...
  • Page 2 Important: Appliance must be installed with a Rinnai approved flue system. This appliance shall be installed in accordance with: - Manufacturer’s installation instructions - AS/NZS 5601.1 - Local regulations and municipal building codes Installation, servicing and repair shall be carried out only by authorised personnel.
  • Page 3: Table Of Contents

    Specification ............ 4 Clearances ............5 Location ............6 Gas connection ..........7 Flueing options ..........8 Flueing guidelines ........... 9 Arriva flue components ........10 Flue transition ..........12 Installation ............13 Installing the log set ........14 Commissioning ..........15 Setting the air guide vane........
  • Page 4: Specification

    Noise level Inside appliance, upper right hand side 33-41 dB(A) (beside convection fan). * Will vary according to gas type and flue configuration ** Will vary depending on geographical location in NZ 4 | Arriva 750 Installation Guide: 10473-C 03-13...
  • Page 5: Clearances

    For every 25 mm of added mantel depth, there must be an additional 25 mm of vertical clearance. For example a mantel depth of 100 mm requires a vertical clearance of 150 mm. Arriva surround clearances Arriva 750 Installation Guide: 10473-C 03-13 | 5...
  • Page 6: Location

    Location The main points governing location are flueing and warm air distribution. The Rinnai Arriva has a cool outer casing, it can be installed into an existing masonry, or decorative fireplace. Enclosure dimensions The heater must be positioned on a flat level surface that allows free movement of the appliance.
  • Page 7: Gas Connection

    All dimensions are in mm. Direct flue wall penetration points Arriva 750 Installation Guide: 10473-C 03-13 | 7...
  • Page 8: Flueing Options

    Flue terminal can be 5.5 m. The flue transition for all The Arriva must not be flued into natural flueing installations, excluding direct draft cavities. horizontal flueing, is counted a 90° bend. 8 | Arriva 750 Installation Guide: 10473-C 03-13...
  • Page 9: Flueing Guidelines

    Supporting the flue is usually completed during the framing stage with flue supports or straps within the cavity. Arriva 750 Installation Guide: 10473-C 03-13 | 9...
  • Page 10: Arriva Flue Components

    This kit also contains a • O-ring for ESPIPE (4350) sub-kit called the condensate drain • Spacer for ESPIPE (4351) kit (shown in next panel), and the flue slide stopper (part 4822). 10 | Arriva 750 Installation Guide: 10473-C 03-13...
  • Page 11 ASPKIT03. Colour - warm white. Contains: • External wall plate (PVC) • End cap (aluminium) Arriva 750 Installation Guide: 10473-C 03-13 | 11...
  • Page 12: Flue Transition

    Flue Outlet horizontal offset flue, the flue transition is fastened to the rear of the wall by standoff brackets supplied. Appliance needs to be down Down and out flue transition rated—refer data plate. 12 | Arriva 750 Installation Guide: 10473-C 03-13...
  • Page 13: Installation

    (supplied in the plastic bag with the remote control), or the flue slide stopper (provided with the ASPDFK Appliance mounting and ASPKIT03 flue kits). The points clamping component will 5: Secure heater Arriva 750 Installation Guide: 10473-C 03-13 | 13...
  • Page 14: Installing The Log Set

    Place the right hand bottom log on the opposite side. Replace the combustion 6. Placing the right hand bottom log chamber glass panel and secure in place with the two retaining screws. 14 | Arriva 750 Installation Guide: 10473-C 03-13...
  • Page 15: Commissioning

    Do not attempt to adjust the air flow direction while the appliance is operating or still hot as this could result in a burn injury. Arriva 750 Installation Guide: 10473-C 03-13 | 15...
  • Page 16: Panel Installation

    Installing the front panel screws, through the front of the warm air discharge louvre. Installing the top panel Push the top panel down into place and secure with the screws provided. Installing the top panel 16 | Arriva 750 Installation Guide: 10473-C 03-13...
  • Page 17: Flame Pattern

    If the appliance cannot be made to perform correctly please contact Rinnai. Arriva 750 Installation Guide: 10473-C 03-13 | 17...
  • Page 18: Installation Checklist

    Complete the installation checklist in the customer operation guide, and make sure you leave the guide with the customer. Explain to the customer about the use and care of the unit, and ensure they understand the instructions and operation of the appliance. 18 | Arriva 750 Installation Guide: 10473-C 03-13...
  • Page 19: Wiring Diagram

    Solenoid Valve Processing Unit Transformer Pilot Burner FR1~4 Flame Rods 1~4 Front Burner Remote Controller REARB Rear Burner Convection Fan REARB (L) Rear Burner Left Convection Fan REARB(R) Rear Burner Motor Right Sparker Arriva 750 Installation Guide: 10473-C 03-13 | 19...
  • Page 20 Experience our innovation Rinnai.co.nz 0800 746 624 http://www.youtube.com/rinnainz...