Rinnai INBUILT ROYALE - ETR Customer Operation & Installation Manual
Rinnai INBUILT ROYALE - ETR Customer Operation & Installation Manual

Rinnai INBUILT ROYALE - ETR Customer Operation & Installation Manual

Flame fire
Hide thumbs Also See for INBUILT ROYALE - ETR:

Advertisement

INBUILT ROYALE - ETR
Customer Operation & Installation Manual
This appliance shall be installed in accordance with:
Manufacturers Installation Instructions
Local Gas Fitting Regulations
Municipal Building Codes
Installation code AS/NZS 5601 'Gas Installations'
Any other local relevant Statutory Regulation
Installation & Service must be performed by an authorised person.
This heater is NOT designed to be built directly into a combustible opening.
For combustible opening installations, a Rinnai zero clearance kit must be used
and is available from your gas appliance retailer.
All Rinnai gas products are
A.G.A. certified
INSTALLER: PLEASE LEAVE THIS MANUAL WITH THE END USER AFTER INSTALLATION
END USER: RETAIN THIS MANUAL FOR FUTURE REFERENCE
FLAME FIRE
ISO 9001 Lic 4983
SAI Global

Advertisement

Table of Contents
loading

Summary of Contents for Rinnai INBUILT ROYALE - ETR

  • Page 1 Installation & Service must be performed by an authorised person. This heater is NOT designed to be built directly into a combustible opening. For combustible opening installations, a Rinnai zero clearance kit must be used and is available from your gas appliance retailer.
  • Page 2: Table Of Contents

    INSTALLATION IN TO A COMBUSTIBLE OPENING ..........20 INSTALLERS INFORMATION - LOG INSTALLATION........... 24 INSTALLERS INFORMATION - WIRING DIAGRAM..........26 INSTALLATION / COMMISSIONING CHECKLIST ..........27 CUSTOMER INFORMATION - CONTACTS............29 Inbuilt Royale - ETR - ii - Issue 4 ©Rinnai...
  • Page 3: Customer Information - Control Panel

    Temporarily changes operation from turns heat down to OFF. ON to OFF or OFF to ON, until next (Pilot only) programmed setting is reached. When OFF, Thermostat turns heat down to LOW. Inbuilt Royale - ETR - 1 - Issue 4 ©Rinnai...
  • Page 4 If the appliance fails to ignite after 4 attempts, will turn the burners down to the OFF heat setting contact Rinnai as a service call may be required. when the selected temperature is reached. •...
  • Page 5 If the Timer(s) have been selected, and the heater is in standby mode, and the OFF button on the Remote Control is pressed, the Timer(s) will be deactivated. Royale - Inbuilt - ETR - 3 - Issue 4 - ©Rinnai...
  • Page 6: Customer Information - Setting The Clock

    Turn to the next page to operate the dual timer. The programmed time must be selected and locked-in within one minute of the On Timer indicators flashing otherwise the programmed times will not be retained in the system memory. Inbuilt Royale - ETR - 4 - Issue 4 - ©Rinnai...
  • Page 7: Operating The Timers

    The temperature differential at the time of sensing the room governs how long before the program ON time the microcomputer will operate the heater and ignite the burner. Inbuilt Royale - ETR - 5 - Issue 4 - ©Rinnai...
  • Page 8: Customer Information - Safety Points

    This appliance must not be used for any purpose other than heating. Inbuilt Royale - ETR - 6 - Issue 4 - ©Rinnai...
  • Page 9 Do not place containers of liquid on top of the heater. Liquid spillage can cause extensive damage to the appliance. Inbuilt Royale - ETR - 7 - Issue 4 - ©Rinnai...
  • Page 10 DO NOT PLACE ARTICLES ON OR AGAINST THIS APPLIANCE. DO NOT USE OR STORE FLAMMABLE MATERIALS NEAR THIS APPLIANCE. DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS IN OPERATION. Inbuilt Royale - ETR - 8 - Issue 4 - ©Rinnai...
  • Page 11: Customer Information - Error Codes

    In all cases, you may be able to clear the Error Message simply by turning the heater OFF, then ON again. If the Error Message still remains or returns on the next operation, please contact your nearest service contact and arrange for a service call. Inbuilt Royale - ETR - 9 - Issue 4 - ©Rinnai...
  • Page 12: Customer Information - Trouble Shooting

    See Error Message page 9. Control Panel • NOTE: If you have any other faults or problems, please refer to your installer or a Rinnai Customer Care Centre Consultant on 1300 555 545. • IMPORTANT: Do not remove any panels or attempt to carry out any service work other than that mentioned in the Trouble Shooting chart.
  • Page 13 Issue 4 Intentionally Blank Inbuilt Royale - ETR - 11 - Issue 4 - ©Rinnai...
  • Page 14: Customer Information - Important Points

    CUSTOMER INFORMATION - IMPORTANT POINTS Issue 4 Unpack the heater and check for damage. DO NOT INSTALL DAMAGED HEATER. If the heater is damaged, contact your supplier for advice. Before installing the heater, check the label for the correct gas type (see rating plate, front right hand side of bottom panel). Refer to local gas authority for confirmation of the gas type if you are in doubt.
  • Page 15: Customer Information - Specifications

    Ignition: Electronic spark Power Supply: 240 V 50 Hz unit is supplied with 3 pin plug and supply lead, replace only with Rinnai P/N. 90179599 (Aust). 6765B (NZ). Fan: Tangential 2 speed, Watt Rating 90W. Rating Plate location: Bottom panel, front right hand side Weight: 54 Kgs.
  • Page 16: Installers Information - Location

    For combustible open- (it must not be above the heater). Alternatively ing installations a Rinnai zero clearance kit - unit can be direct wired if the power supply is must be used and is available from your gas to be concealed.
  • Page 17: Technical Specification

    Inbuilt only Weight: 54 Kgs. Flue requirement: A Rinnai approved flue system is mandatory for this appliance, to be installed in accordance with AS/NZS 5601. The manufacturer reserves the right to change or modify specifications without notice. Inbuilt Royale - ETR - 15 - Issue 4- ©Rinnai...
  • Page 18 INSTALLERS INFORMATION - DIMENSIONS Inbuilt Royale - ETR - 16 - Issue 4- ©Rinnai...
  • Page 19: Installation Into Masonry Fireplace & Chimney

    If the heater is not properly supported noise and vibration may result. 3. Install Flue For installations into a masonry fireplace a Rinnai Flexible Flue system is required. (Flexliner01). Rinnai rigid flame fire flueing is not suitable. Assemble flue in accordance with the instructions supplied with the flue kit.
  • Page 20 8. Remove the screws from both ends of the lower front panel (Caution: 240V switch attached to panel). 9. Remove the top and bottom screws from the centre louvre rod-retaining bracket. Royale - Inbuilt ETR - 18 - Issue 4 ©Rinnai...
  • Page 21 - for Log installation details, please refer to page 24. Replace and refit all parts that have been removed in reverse order. 8. Commissioning - for Commissioning details, please refer to page 27. Royale - Inbuilt ETR - 19 - Issue 4 ©Rinnai...
  • Page 22: Installation In To A Combustible Opening

    Flame Fire Royale into a decorative fireplace for either a single storey or two storey home. All you need is a flat wall which can be either external or internal and a zero clearance box. A Rinnai Rigid flue MUST also be installed (Part No.
  • Page 23 2. Construct frame in accordance with the dimensions shown: 745 mm 440 mm 810 mm 3. Install Rinnai Zero Clearance Box (ZEROR) • ‘Zero clearance’ means the panels of metal from the zero clearance box can be in contact with any combustible material.
  • Page 24 Copper supply should be run leaving a flared connection at the position shown. Attach the stainless steel flexitube supplied to the flared connection. 5. Install Rinnai Flame Fire Rigid Flueing as per the instructions supplied with the flue kit, taking careful note of the following: Flue termination above the roof must comply with AS/NZS 5601.
  • Page 25 10.Install top decorative surround to face of fireplace. 11. Log Installation - for log installation details, please refer to page 24. 12.Commissioning - for Commissioning details, please refer to page 27. Royale - Inbuilt ETR - 23 - Issue 4 ©Rinnai...
  • Page 26: Installers Information - Log Installation

    Note: When first lighting the heater, the logs need to be burnt in, which may take approximately 2 hours. The flame colour may change after the initial burning in period. Inbuilt Royale - ETR - 24 - Issue 4 - ©Rinnai...
  • Page 27 • All burner aerations are factory preset and High position in a well ventilated room. cannot be adjusted. Inbuilt Royale - ETR - 25 - Issue 4 - ©Rinnai...
  • Page 28: Installers Information - Wiring Diagram

    If the supply cord is damaged or requires replacing, it must be replaced by the manufacturer or the manufacturers agent or similarly qualified person in order to avoid a hazard. The supply cord must only be replaced with a genuine Rinnai spare part. (Part No. 90182065)
  • Page 29: Installation / Commissioning Checklist

    Model: _______________________________ 1. Was a fireplace inspection carried out? (i.e. clearances, combustibles etc). 2. Was a Rinnai flue system installed in accordance with the instructions? 3. Have specified gas pressures been checked and set? 4. Are decorative logs located correctly? 5.
  • Page 30 NOTES Inbuilt Royale - ETR - 28 - Issue 4- ©Rinnai...
  • Page 31: Customer Information - Contacts

    CUSTOMER INFORMATION - CONTACTS The Rinnai Flame Fire Heater Family Inbuilt Royale Freestanding Royale Inbuilt Slimfire IB35 / IB35ETR FS35 / FS35ETR IB25 Australia Pty. Ltd. ABN 74 005 138 769 Head Office Internet: www.rinnai.com.au E-mail: enquiry@rinnai.com.au 10-11 Walker Street,...

Table of Contents