False Fireplace Installation - Rinnai 650 Operation & Installation Manual

Hide thumbs Also See for 650:
Table of Contents

Advertisement

FALSE FIREPLACE INSTALLATION

Read this manual thoroughly and gain a full understanding of the requirements before
undertaking installation.
IMPORTANT
Ensure gas supply to heater is turned off for the first stages of this instruction.
Step 1.
Prepare Site - p.32
Step 2.
Unpack The Heater Engine - p.32
Step 3.
Install Flue - p.32
Step 4.
Zero Clearance Frame Installation - p.33
Step 5.
Install Cladding - p.33
Step 6.
Positioning the Heater Engine - p.34
Step 7.
Connect Electrical Supply - p.34
Step 1. Prepare Site
Ensure the intended enclosure meets the requirements of the dimensions as stipulated in
"ENCLOSURE REQUIREMENTS" on page 22 and that gas and electrical supplies have been
IMPORTANT
prepared in accordance with the dimensions stipulated in "GAS SUPPLY" on page 24 and
"ELECTRICAL SUPPLY" on page 25.
Ensure there are no wall studs, noggins, ceiling joists, wiring or other obstruction within the wall
and or ceiling cavity where the flue is proposed to penetrate.
Step 2. Unpack The Heater Engine
The heater engine is supplied in one carton, check to ensure you have all
contents as listed under "BEFORE YOU START" on page 4 at the start of
this manual before proceeding. Carefully remove carton by removing the
straps and lifting the carton off the appliance. Remove all packaging
materials and check all components for damage. If ANY damage is evident
DO NOT install or operate this appliance. Contact your supplier for advice.
Step 3. Install Flue
Connect both the Ø 100mm exhaust pipe
75mm inlet pipe
flues to co-linear to coaxial adaptor
B
, noting that the larger diameter pipe is for the exhaust,
C
securing both pipes to the co-linear to coaxial adaptor
firmly with pipe clamps
Affix the coaxial mounting plate
upwards to the framing (max from top of heater height
600mm). Feed the flexi-liner flue pipes through the
coaxial mounting plate
opening ensuring that exhaust pipe
when being viewed from the front of the opening, then
secure co-linear to coaxial adaptor
mounting plate
.
E
Once the pipe ends are accessible from the opening, the
adaptor and other flue components may then be secured
in place and weather sealed where necessary
At the enclosure opening attach both exhaust pipe
and inlet pipe
flues to the engines spigot plate
B
noting again that the larger diameter pipe is for the
exhaust, when viewed from the front this will be to the
right. Secure both pipes to the spigot plate
pipe clamps
.
G
If pre-fitting flue prior to engine delivery, leave sufficient lengths of both the Ø 100mm exhaust
pipe
and the Ø 75mm inlet pipe
A
IMPORTANT
of the flues to the engine spigot plate
Rinnai
HEATER ENGINE INSTALLATION
and the Ø
A
.
D
with the flange fold
E
and down to the enclosure
E
is on the right
A
to the coaxial
C
firmly with
F
B
Step 8.
Prepare Gas Supply - p.34
Step 9.
Insert Heater Engine Into Fireplace - p.34
Step 10. Securing The Heater Engine - p.34
Step 11. CONNECTING THE GAS SUPPLY - p.35
Step 12. LEAK TESTING - p.35
Step 13. BURNER MEDIA INSTALLATION - p.36
Step 14. COMMISSIONING INSTRUCTIONS - p.39
D
B
A
A
,
F
G
within the enclosure opening. This will enable connection
which is on the heater to be installed.
E
32
Retain
the
cardboard
carton for use in the
HINT
"Positioning The Heater
Engine" on page 31.
C
C
E
A
E
C
E
B
F
DV 600_700 OIM
R

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

750Rdv600erRdv700er600

Table of Contents