Commissioning Instructions - Rinnai 650 Operation & Installation Manual

Hide thumbs Also See for 650:
Table of Contents

Advertisement

Step 1. Unpack the Fascia
For commissioning, the control panel
located on the fascia will need to be
connected to the communication cable of
the heater engine.
The Fascia Assembly is supplied in a
separate carton, check to ensure you have
all the contents as listed on "CARTON
CONTENTS / ITEM CHECKLIST" on
page 4 at the start of this manual before
proceeding.
Remove
materials and check all components for
damage. If ANY damage is evident DO
NOT install or operate this appliance.
Contact your supplier for advice.
Step 2. Connect Push Button Control
Carefully pick up fascia assembly, and
position the fascia close to the heater
engine.
Connect the RJ45 plug
located on the back of fascia on the
B
bottom left hand corner, (this connects the
push
button
control
communications
cable
engine's control box).
Lean the fascia up against a wall, placing the card board carton between the fascia and the wall
will protect both the wall and the fascia from being damaged while completing the heater
HINT
commissioning.
Step 3. Switch On the Electricity Supply
240 VOLTS, RISK OF ELECTRICAL SHOCK!
Installation and commissioning must be carried out by an Authorised person.
WARNING
Wiring inside this appliance may be at 240V potential, when performing the commissioning, the
appliance electrical power will need to be connected. Exercise CAUTION as there is potential for
electric shock from the exposed wiring and circuitry. DO NOT leave the appliance unattended
when power is connected and the panels are removed.
Step 4. Commission the Appliance
DO NOT test for gas escapes with an open flame.
The gas type codes and gas pressures for this appliance MUST BE checked and set in accordance
WARNING
with these instructions when the appliance is installed, OR after the replacement of any
component or reassembly after service.
Burner gas pressures and gas types are factory set.
The location of the gas control is in the air gap at the lower right hand side of the appliance.
The location of the data plate
of the appliance.
Gas supply pressure is to be checked with all other gas appliances in the household running on
high. Failure to check this may result in lower than recommended required gas pressures,
NOTE
resulting is poor performance and reduced flame effect.
Rinnai

COMMISSIONING INSTRUCTIONS

all
packaging
into the socket
A
panel
via
a
to
the
heater
is on the base plate of the heater engine within the air gap on the right hand side
C
C
A
B
39
V 600_700 OIM
RD

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

750Rdv600erRdv700er600

Table of Contents