Preparing for installation
System on the primary side WWC (water/water)
6
6
5
5
A Flow direction
Required devices
Pos.
Description
1
Heat pump
2
Integral primary pump
3
Return well
4
Delivery well
5
Well pump
■ Suction pump for groundwater
■ Connect via on-site contactor with fuse protection
■ Possibly provide three-phase power for the pump
■ See conversion from type BW to type WW from page 74
6
Dirt trap
7
Flow limiter (remove jumper when connecting)
8
Heat exchanger
9
Brine accessory pack
qP
Frost protection monitor intermediate circuit (if an AC-Box is connected,
connect the frost protection monitor of the intermediate circuit in series
with the frost protection monitor of the AC-Box).
qQ
Frost protection monitor of the AC-Box (option)
qW
Integral control unit
26
9
7
8
4
4
A
A
A
A
qW
2
qP
qQ
1
1
3
3