Positioning - Viessmann Vitocal 300-G BW Installation And Service Instructions Manual

Compact heat pump with electric drive
Table of Contents

Advertisement

Positioning

Installation room requirements
■ The installation room must be dry and
safe from the risk of frost.
■ To prevent corrosion damage, provide
the brine-side heat pump installation
with thermal insulation in accordance
with current rules as vapour diffusion
proof installation.
■ To prevent damage to the building
structure, please pay attention to the
permissible load-bearing capacity of
the floor.
■ To prevent structure-borne noise,
never set up the appliance on ceilings
with wooden joists (e.g. in the attic).
■ Observe required wall clearances as
shown in the following diagram.
■ Level the appliance.
■ Required room height when utilising
the connection panel: 2,050 mm (min).
Clearance dimensions (plan view)
100
A
Clearance A
no limitation
≥ 400
no limitation
variable
≥ 400
Preparing for installation
Heat pump posi-
tioning
(including addi-
tional accessories
adjacent on the
left)
Heat pump alone
Heat pump with AC-
Box
Heat pump (lead
appliance) with lag
heat pump (stage 2)
Heat pump in a cas-
cade
Installation instructions AC-Box
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitocal 300-g bwcVitocal 300-gwwVitocal 300-g wwc

Table of Contents