Preparing for installation
System on the primary side WWC (water/water)
A Flow direction
Required devices
Pos.
Description
1
Heat pump
2
Integral primary pump
3
Return well
4
Delivery well
5
Well pump
Suction pump for groundwater
Connect via on-site contactor with fuse protection
Possibly provide three-phase power for the pump
See conversion from type BW to type WW from page 77
6
Dirt trap
7
Flow limiter (remove jumper when connecting)
8
Heat exchanger
9
Brine accessory pack
qP
Frost protection monitor intermediate circuit (if an AC-Box is con-
nected, connect the frost protection monitor of the intermediate circuit
in series with the frost protection monitor of the AC-Box).
qQ
Frost protection monitor of the AC-Box (option)
qW
Integral control unit
28