2. Installation
17.
Complete the bridge unit attachment. Refer to the procedure for connecting the optional
unit downstream of the bridge unit.
18.
After the finisher is installed, turn ON the main power.
19.
Check that the finisher can be selected at the operation panel.
194
page 195 "Booklet Finisher SR3220 (D3B9)"