Execution Of Data Link; Confirmation Of Operation By Led Indication - Mitsubishi FX2N-16CCL-M User Manual

Cc-link master module
Hide thumbs Also See for FX2N-16CCL-M:
Table of Contents

Advertisement

FX2N-16CCL-M CC-Link System Master Block
11.3

Execution of Data Link

Turn on the power of the remote device stations first, turn on the power of the master station,
then start the data link.
11.3.1

Confirmation of operation by LED indication

The figures below show the LED indication status in the master station and the remote device
stations while the data link is proceeding normally.
1) LED indication in the master station
Make sure that the LED indication status is as shown below.
FX
-16CCL-M
2N
2) LED indication in the remote device station
Make sure that the LED indication status is as shown below.
A
FX
2N
RUN
ERR.
MST
TEST1
TEST2
L RUN
L ERR.
POWER
SW
M/S
PRM
TIME
LINE
SD
RD
J65BT-64AD
-32CCL
POWER
LRUN • LERR • RD • SD
Communication between Master Station and Remote Device Stations 11
The module is normal.
The module is set as the master
station.
Data link is normally proceeding.
Data is being transmitted.
E
R
R
O
R
Data is being received.
PW
RUN
L RUN
SD
RD
L ERR.
5V DC is supplied from the PLC.
Data link is normally proceeding.
Data is being transmitted.
Data is being received.
24V DC is supplied.
The module is normal.
Data link is normally
proceeding.
Data is being transmitted.
Data is being received.
11-9

Advertisement

Table of Contents
loading

Table of Contents