Removing/Installing Seat Stop Screws - Invacare Arrow RWD Service Manual

Hide thumbs Also See for Arrow RWD:
Table of Contents

Advertisement

SECTION 10—BASE FRAME
NOTE: For wheelchairs equipped with MKIV electronics.
1. Remove the seat frame. Replacing the Seat Frame on page 66
2. Remove the seat support brackets. Refer to Replacing Seat Support Brackets on
page 86.
3. Remove the two mounting screws that secure the battery charger connector to the
mount bracket.
4. Remove battery charger connector from mount bracket.
5. Remove the mounting screw which secures the battery charger mount bracket to the
T-nut located in the channel of the base frame.
6. Replace battery charger mount bracket and secure to base frame with existing
mounting screw.
NOTE: To replace the Battery Charger Bracket T-Nut, perform STEPS 3-13 in Replacing Seat
Support Bracket T-Nuts on page 86.
7. Secure the battery charger connector to the mount bracket with the existing two
mounting screws. Tighten securely.
8. Reverse STEP 2.
Mounting Screw
Battery Charger
Mount Bracket
Base Frame
FIGURE 10.4 Replacing Battery Charger Bracket and T-Nut

Removing/Installing Seat Stop Screws

NOTE: For this procedure, refer to FIGURE 10.5 on page 89.
NOTE: The rear seat stop screw should only be removed if replacing a T-nut for either the seat
support bracket or the battery charger mount bracket. The front seat stop screw should NEVER be
removed.
1. Unthread seat stop screw from base frame.
The seat stop screws MUST be in place before operation of your power wheelchair.
Ensure the seat support bracket is positioned between both seat stop screws.
3G Storm Series® Wheelchairs
WARNING
88
Battery Charger Connector
T-Nut
Part No. 1104849

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Torque sp rwdRanger x rwd3g storm series

Table of Contents