NOTE: Make sure the closed end of the battery box retainer clip is pointing up.
ii. Install the mounting screw that secures the retainer clip to the battery box
sub-frame. Use Loctite
iii. Line up the new battery box retainer bar and spacers with mounting holes in
the base frame.
iv. Reinstall the mounting screws that secure the battery box retainer bar to the
base frame. Use Loctite 242 and torque to 160 in-lbs (13.36 ft-lbs)(18.03 Nm).
• Wheelchairs Equipped without Vent Tray - Reinstall the four mounting screws that
secure the shocks and spacers to the base frame.
5. Perform STEPS 2-7 of Removing/Installing the Wiring Harness on page 131 to
complete the wiring harness installation.
6. Install the group 24 battery boxes. Refer to Removing/Installing Battery Boxes on
page 121.
Part No. 1104849
242 and torque to 160 in-lbs (13.36 ft-lbs)(18.03 Nm).
®
129
SECTION 12—BATTERIES
3G Storm Series® Wheelchairs