Invacare Arrow RWD Service Manual page 128

Table of Contents

Advertisement

SECTION 12—BATTERIES
Locknut
Battery Mount
Bracket
Mounting Screws
*Rubber
Element
*NOTE: Illustration depicts rubber element. Battery Mount Brackets remove in
the same manner for the shock assembly.
Installing Group 24 Components
NOTE: For this procedure, refer to FIGURE 12.16 on page 130.
1. Line up the mounting holes in the front of the new battery box sub-frame and the
NEW wiring harness w/bracket with the mounting holes in the base frame.
2. Install the two mounting screws through the wiring harness w/bracket, battery box
sub-frame, and base frame.
3. Install the locknuts onto mounting screws. Torque to 160 in-lbs (13.36 ft-lbs)(18.03
Nm).
4. Perform one of the following:
• Wheelchairs Equipped with Vent Tray -
The Battery Box Retainer/Retainer Clip MUST be fastened securely in place before
using the wheelchair. Use Loctite 242 and torque to 160 in-lbs (13.36 ft-lbs)(18.03 Nm).
i. Position the retainer clip between the new battery box sub-frame and the top of
the rubber element or shock assembly making sure the retainer clip mounting
hole is towards the bottom and the closed end of the clip is against the battery
box retainer bar.
3G Storm Series® Wheelchairs
Washer
FIGURE 12.15 Removing 22NF Components
WARNING
128
Spacer
Base
Frame
Part No. 1104849

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Torque sp rwdRanger x rwd3g storm series

Table of Contents