Connecting the SRX550 Services Gateway to the Building Structure on page 70
When planning the installation site for the SRX550 Services Gateway, you need to allow
sufficient clearance around the rack.
When planning the installation site for the services gateway, consider the following:
For the cooling system to function properly, the airflow around the chassis must be
unrestricted.
Figure 12 on page 44

Figure 12: Airflow Through the Chassis

For service personnel to remove and install hardware components, there must be
adequate space at the front and back of the services gateway as indicated in
Table 13 on page
45.
If you are mounting the services gateway in a rack with other equipment, ensure that
the exhaust from other equipment does not blow into the intake vents of the chassis.