Srx550 Services Gateway Cabinet Airflow Requirements - Juniper SRX550 Hardware Manual

Hide thumbs Also See for SRX550:
Table of Contents

Advertisement

SRX550 Services Gateway Hardware Guide

SRX550 Services Gateway Cabinet Airflow Requirements

Related
Documentation
48
Clearance Requirements for Airflow and Hardware Maintenance of the SRX550 Services
Gateway on page 44
When you mount the SRX550 Services Gateway in a cabinet, you must ensure that
ventilation through the cabinet is sufficient to prevent overheating. Consider the following
when planning for chassis cooling:
Ensure that the cool air supply you provide through the cabinet can adequately dissipate
the thermal output of the services gateway.
Install the services gateway as close as possible to the front of the cabinet so that the
cable management system clears the inside of the front door. Installing the chassis
close to the front of the cabinet maximizes the clearance in the rear of the cabinet for
critical airflow.
Route and dress all cables to minimize the blockage of airflow to and from the chassis.
SRX550 Services Gateway Chassis on page 13
SRX550 Services Gateway Cabinet Size and Clearance Requirements on page 47
SRX550 Services Gateway Spacing of Mounting Bracket and Flange Holes on page 43
SRX550 Services Gateway Rack Size and Strength Requirements on page 43
Clearance Requirements for Airflow and Hardware Maintenance of the SRX550 Services
Gateway on page 44
Copyright © 2015, Juniper Networks, Inc.