Removing The Full Bed; Installing The Full Bed - Toro 07385H Operator's Manual

Utility vehicle with bed
Hide thumbs Also See for 07385H:
Table of Contents

Advertisement

Removing the Full Bed

1. Start the engine, engage the hydraulic-lift lever, and
lower the bed until the cylinders are loose in the slots.
2. Release the lift lever and turn off the engine.
3. Remove the lynch pins from the outer ends of the
cylinder rod clevis pins
1. Cylinder rod end
2. Bed-mounting plate
3. Clevis pin
4. Remove the clevis pins securing the cylinder rod ends
to the bed-mounting plates by pushing the pins towards
the inside
(Figure
32).
5. Remove the lynch pins and clevis pins securing the
pivot brackets to the frame channels
6. Lift the bed off of the machine.
CAUTION
The full bed weighs approximately 148 kg (325
lb), so do not try to install or remove it by
yourself. Use an overhead hoist or get the help
of 2 or 3 other people.
7. Store the cylinders in the storage clips.
8. Engage the hydraulic lift-lock lever on the machine to
prevent accidental extension of the lift cylinders.
(Figure
32).
Figure 32
4. Lynch pin
5. Rear slots (full bed)
6. Front slots (2/3 bed)
(Figure

Installing the Full Bed

Note: If the bed sides will be installed on the flat bed, it is
easier to install them before installing the bed on the machine.
Note: Ensure that the rear pivot plates are bolted to the bed
frame/channel so that lower end angles to the rear
1. Left, rear corner of bed
2. Machine frame channel
3. Pivot plate
CAUTION
The full bed weighs approximately 148 kg (325 lb),
so do not try to install or remove it by yourself. Use
an overhead hoist or get the help of 2 or 3 other
people.
32).
Note: Ensure that the spacer brackets and wear blocks
(Figure
34) are installed with the carriage bolt heads
positioned inside the machine.
35
(Figure
Figure 33
4. Clevis pin
5. Lynch pin
33).

Advertisement

Table of Contents
loading

This manual is also suitable for:

0738507385tc0738707387h07387tcWorkman hdx-d

Table of Contents