Fuel Shut-Off Valve - Suzuki GSX-R1000 Service Manual

Hide thumbs Also See for GSX-R1000:
Table of Contents

Advertisement

Manuals by Motomatrix / The Solution For Lost Motorcycle Coded Keys
Installation
Install the EVAP system purge control solenoid valve in
the reverse order of removal. Pay attention to the
following point:
• Tighten the EVAP system purge control solenoid valve
mounting nut to the specified torque.
Tightening torque
EVAP system purge control solenoid valve
mounting nut (a): 6.5 N·m (0.65 kgf-m, 4.5 lbf-ft)
• Tighten the EVAP system purge control solenoid valve
bracket bolt.
Tightening torque
EVAP system purge control solenoid valve
bracket bolt (b): 10 N·m (1.0 kgf-m, 7.0 lbf-ft)

Fuel Shut-off Valve

Removal
1) Remove the front seat. Refer to "Exterior Parts
Removal and Installation" in Section 9D (Page 9D-
6).
2) Remove the battery. Refer to "Battery Removal and
Installation" in Section 1J (Page 1J-11).
3) Remove the ECM. Refer to "ECM Removal and
Installation" in Section 1C (Page 1C-1).
4) Remove the frame cover assembly. Refer to
"Exterior Parts Removal and Installation" in Section
9D (Page 9D-6).
5) Disconnect the cooling fan relay (1) from the rear
fender (front).
email: info@motomatrix.co.uk / www.motomatrix.co.uk
(a)
I947H1120030-01
(b)
I947H1120041-01
Emission Control Devices:
6) Disconnect the license plate light coupler (2).
2
7) Remove the rear fender (rear) (3).
8) Remove the battery mat (4).
4
9) Disconnect the fuse box (5), AP sensor (6) and TO
sensor (7) from the rear fender (front).
10) Remove the rear fender (front) mounting bolt (8).
5
6
1B-13
1
I947H1120031-01
3
I947H1120032-01
I947H1120033-01
7
8
I947H1120034-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents