3) Remove the parts, and remove the upper cleaning roller
(S07/Ua01/P05/REP).
(AR-C100/C150)
(AR-C250/C160/C270)
S07/Ua01/P05/REP
S07/Ua01/P06
Gear
∗
Apply grease to the gear.
(AR-C100/C150/C250)
(AR-C160/C270)
S07/Ua01/P07
Fusing drive motor
1) Remove the screw and the connector, and remove the fusing
drive motor (S07/Ua01/P07).
S07/Ua01/P05/REP
S07/Ua01/P06/GRE/CHK
S07/Ua01/P06/GRE/CHK
(AR-C100/C150/C250)
(AR-C160/C270)
S07/Ua01/P08
Upper heat roller gear R
1) Remove the upper heat roller unit. S07/Ua01/P13
∗
Apply grease to the inside of the collar.
(This is not installed to the AR-C160/C270.)
∗
For the AR-C160/C270 replace the whole unit of the upper heat
roller unit.
S07/Ua01/P09
Oil applying felt
1) Remove the fusing front cover.
2) Remove the screw, the pipe holder, and the oil applying felt unit.
3) Remove the screw, and remove the oil applying felt
(S07/Ua01/P09/REP).
5
4
S07/Ua01/P09/REP
∗
When assembling, tighten the screws in the sequence of
numbering.
11 – 27
S07/Ua1/P07
S07/Ua1/P07
GRE
S07/Ua01/P08/CHK/REP
3
2
1