Camus Hydronics DFH/W500 Installation, Operation And Service Manual page 42

Dynaflame series gas fired commercial copper tube and stainless steel boilers
Table of Contents

Advertisement

Slave Boiler
Description
Slave boiler lead lag setup
37
Electrical Connection(s)
The following steps are performed at the factory and verifying on site will
be sufficient:
15) Select Pump Configuration
16) Press [Advanced Options >>]
17) Press the
to arrive at Central Heat Pump or DHW Pump
18) On Options:
Local burner demand
19) On Options: Local Lead Lag
Service Active
20) Force On:
Outlet high limit
Programming Instructions
1) Press
and
2) Select System Identification & Access
3) Verify Modbus address. To be in sequential order
4) Select Lead Lag Slave Configuration
5) Select Slave Enabled = Enable slave for built-in Lead Lag master

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents