Sequence Of Operation - Camus Hydronics DFH/W500 Installation, Operation And Service Manual

Dynaflame series gas fired commercial copper tube and stainless steel boilers
Table of Contents

Advertisement

Sequence of Operation

Flow Switch = Flow Switch, Low Water Cutoff (if equipped)
Gas Pressure Switch = Low gas pressure switch (4.5" w.c., N/O), High gas pressure swtich (14" w.c., N/C)
Air Pressure Switch = Blocked flue switch (N/C), Air Proving Switch (N/O)
28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents