Step 1:
Step 2:
N o t e :
Step 3:
Step 4:
C A U T I O N :
3
Rough-in Conduit and Wiring
Plan wire entry to the rack.
Make the desired conduit access (top, bottom, left or right) from the rack. Read
and comply with the label inside the rack which details the recommended access
locations for conduit entry into the rack.
Do not run power and control cable in the same conduit.
Punch holes and install conduit fittings or insert lining materials in conduit
opening.
Be sure there are minimal air gaps.
Wire openings must have fittings, bushings, grommets or fiche paper lining
material to protect the wire and cable insulation from damage by sharp metal
edges, and to prevent air leaks.
See "Wire Routing and Specification" on page 8.
See "Sealing Rack Air Leaks" on page 52.