ETC DRd6-12-120 Installation Manual page 24

Drd rack enclosure
Table of Contents

Advertisement

Step 3:
The rack doors
have been
removed from
this graphic for
clarity of this
procedure.
20
b: Remove the red sense wire from phase 2 (L2) and reroute it to the neutral
bar.
c: Move the second copper strap to connect between phase 2 (L2) and phase
3 (L3).
For cross-bussed DRd12-48 installations, complete step 2 for both racks.
L1
L2
L3
N
L1
L2
L3
N
L1
L2
L3
®
Unison
DRd Rack Enclosure Installation Manual
L1
L2
L3
N

Advertisement

Table of Contents
loading

Table of Contents