Power-Supply Cage - IBM Xseries 345 8670 Maintenance Manual

Hide thumbs Also See for Xseries 345 8670:
Table of Contents

Advertisement

Power-supply cage

Complete the following steps to remove the power-supply cage.
Note:
1. Turn off the server and any attached devices.
2. Disconnect external cables and option cables from the back of the server.
3. Remove the server cover (see "Removing the cover and bezel" on page 50).
4. Remove the air baffle.
5. Disconnect the four power-supply cage cables.
6. Remove the three screws from the power-supply cage.
7. Remove the power-supply cage from the server.
To replace the power-supply cage, reverse the previous steps.
Note: Tilt the power-supply cage during installation so that you insert the rear of
v Read "Before you begin" on page 41.
v Read the safety notices in "Safety notices (multilingual translations)" on
page 124.
v Read "Handling static-sensitive devices" on page 42.
Note: To disconnect the DASD backplane cable, partially remove the DASD
backplane. (See "DASD backplane" on page 79.
Air baffle
the cage first.
Power
supply cage
Raised tabs
Chapter 5. Field replaceable units
81

Advertisement

Table of Contents
loading

Table of Contents