Pipeline Plan - Kranzle therm 895 Operating Instructions Manual

Table of Contents

Advertisement

High pressure
connection
Detergent
1 Float valve, water inlet
2 Water tank
3 Control valve, detergent
4 High pressure pump
5 Press switch pump (ND)
6 Unloader valve
7 By-pass line, unloader
Control panel with light diodes
F1
F1: T32 mA Best.Nr.: 44.200 1

Pipeline plan

8 Press switch, hose
9 Safety valve
10 Excess pressure line, safety valve
1 1 Flow controller
12 Fuel pump with magnetic valve
13 Fuel filter
14 Fuel tank
D12
D7
F2: M 250 mA Best.Nr.: 44.200 2
Control and
safety block
RSB 250
D16
D20
D18
D11
D17
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Therm 1165

Table of Contents