Pipeline Plan - Kranzle 602 E-M 18 Operating Manual

Hot water high-pressure cleaners
Table of Contents

Advertisement

Pipeline plan

Safety valve, number 5 must be set approx. 15 % higher than
the unloader valve on the HP pump
1 Float valve, water inlet
2 Water tank
3 Control valve detergent
4 High pressure pump with integrated unloader valve
5 Safety valve for heating coil
6
Safety valve excess pressure line
7 Flow controller
8 Heating elements
51

Advertisement

Table of Contents
loading

Table of Contents