Pipeline Plan - Kranzle Therm 870-1 Operating Manual

Hot water high-pressure cleaners
Table of Contents

Advertisement

Pipeline plan

High pressure
connection
Detergent
Water inlet
1
Float valve, water inlet
2
Water tank
3
Control valve detergent
4
High pressure pump with integrated unloader valve
5
Flow-Safety-Block with integrated
safety valve for heating coil and flow monitoring device
6
By-Pass line
7
Fuel pump with solenoid valve
8
Fuel filter
9
Fuel tank
Safety valve, number 5 must be set approx. 15 % higher than
the unloader valve on the HP pump.
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents