Steps For Finalizing The Installation - Travis Industries 21 TRV GSR2 Installation Manual

Hide thumbs Also See for 21 TRV GSR2:
Table of Contents

Advertisement

38
Finalizing the Installation

Steps for Finalizing the Installation

1. Remove the glass (see page 40).
NOTE: If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
3. Make sure the accent light bulb is in place.
NOTE: Take care to not touch the bulb with your fingers (use a cloth or paper towel).
4. Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case
the household (AC) power goes out and are required for operation.
the remote (see illustration below). Synchronize the transmitter to the IFC (see the Owner's Manual
for details).
Travis Industries
(for qualified installers only)
4140312
Install three AAA batteries into
100-01305

Advertisement

Table of Contents
loading

Table of Contents