Facing Detail - Drywall Facing - Travis Industries 21 TRV GSR2 Installation Manual

Hide thumbs Also See for 21 TRV GSR2:
Table of Contents

Advertisement

34
Facing Detail – Drywall Facing
Top View - Drywall Facing
Side View - Drywall Facing
Travis Industries
Installation
Any material that protrudes
more than 3/4" in front of the
facing is considered a mantel
and must meet the mantel
requirements in this manual.
NOTE: The facing tucks
behind the flanges.
Recommended Order of Installation We
recommend installing the facing (drywall, tile)
under the notch at the front of the fireplace
("a") - then install the sides and top ("b" and
"c")
b
3/8"
NOTE: The fireplace is shifted back
on the shelf to accommodate the
facing thickness.
(for qualified installers only)
4-7/8"
3-1/4"
30-1/2"
(approx.)
c
The wall trim comes off,
allowing the installer to cover
the drywall edge below the
a
front edge of the fireplace.
NOTE The facing tucks under the notch at the front
of the fireplace (3/8" above the base of the fireplace).
Fireplace
Nailing Bracket
Face
White Tape Gasket
(attached to fireplace)
Fireplace
Facing (drywall, paneling, or other
material - combustible or non-
combustible).
4140312
Drywall, paneling, or other
facing (combustible or non-
combustible).
NOTE: The facing should tuck
behind the wall trim, thus
concealing the top of the facing
and the base of the fireplace.
100-01305

Advertisement

Table of Contents
loading

Table of Contents